Amick Associates, Inc. 1991 Monongahela Incline Cable Installation Project

Amick Associates, Inc. 1991 Monongahela Incline Cable Installation Project

2015

Amick Associates, Inc. is always proud to be rooted in Pittsburgh history. In 1991, Amick Associates, Inc. along with Port Authority Maintenance Personnel, changed out both load and safety cables on the Monongahela Incline in Pittsburgh, Pa. Running 1-1/2" diameter cables and pouring sockets under the cable cars during night shift maintenance operations, the job was completed during that 8 hour shift. Historically, Amick Associates, Inc. Strength and Value....It define us.

cheap jordans|wholesale air max|wholesale jordans|wholesale jewelry